Closed
ETUDE GEOTECHNIQUE, RECEPTION DE FONDS DE FOUILLES ET CONTROLE DE QUALITE DES TRAVAUX de RECONSTRUCTION DE LA MOSQUEE TIGHOULA A SIDI IFNI.
Direction Regionale de l'Agence Nationale des Equipements Publics du Sud
Appel d'offres ouvert
Reference72/2024
CategoryServices
Place of workSidi Ifni
Estimate57,720 MAD
Provisional guarantee900 MAD
Deadline12 Nov 2024, 11:00
Required qualifications
Laboratoires / ETUDES GEOTECHNIQUES / ETUDES GEOTECHNIQUES DES BATIMENTS NON COURANTS / Classe 4 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DES LOTS SECONDAIRES DES BATIMENTS / Classe 4 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DES GROS Å’UVRE DES BATIMENTS NON COURANTS / Classe 4
AI summary of the file
Members onlyDocuments required
Award criterion
Execution time
Points of attention
Read the whole file in 2 minutes: documents, criteria, pitfalls, summed up by the AI reading.
Book a demoSimilar open tenders
See all →RECEPTION DES FONDS DE FOUILLES ET CONTROLE DE LA QUALITE DES TRAVAUX DE CONSTRUCTION DU SIEGE DE LA COUR REGIONALE DES COMPTES LA REGION DE GUELMIM-OUED NOUN A GUELMIM.D-22Direction Regionale de l'Agence Nationale des Equipements Publics du SudLA PRESTATION DE CUISSON AU PROFIT DE L’ETABLISSEMENT SCOLAIRE (DAR TALIB ET TALIBA) AIT ABDELLAH RELEVANT DE LA DIRECTION PROVINCIALE DE SIDI IFNI-AREF GULEMIM OUED NOUN (LOT UNIQUE).D-26Direction Provinciale de l’Education Nationale de Sidi IfniPROJET REALISE DANS LE CADRE DU PROGRAMME NATIONAL D’APPROVISIONNEMENT EN EAU POTABLE ET D’IRRIGATION 2020-2027 (PNAEPI) : Assistance technique pour le contrôle et le suivi des travaux d’alimentation en eau potable desD-12Agence Regionale d'Execution des Projets Guelmim Oued Noun
Your next tender may be published this morning.
Choose an advisor and a time. 30 minutes at most, by video or WhatsApp, in French, Arabic or English.