Closed

RÉALISATION DES ESSAIS DE CONTRÔLE DE QUALITÉ DES TRAVAUX DE DEDOUBLEMENT DE LA RN2 DU PK 419+250 AU PK 437+400 DANS LA PROVINCE DE NADOR.

Reference03/2026/NAD
CategoryServices
Place of workNador
Estimate1,610,982 MAD
Provisional guarantee25,000 MAD
Deadline10 Mar 2026, 10:00
Required qualifications

Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DE TERRASSEMENT ET CHAUSSEES AVEC COUCHE DE ROULEMENT EN REVETEMENT SUPERFICIEL / Classe 1 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DES CHAUSSEES BITUMINEUSES TYPE-1 A BASE DE MELANGE HYDROCARBONE COURANT / Classe 1 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DES OUVRAGES D'ART COURANTS / Classe 1

AI summary of the file

Members only
Documents required
Award criterion
Execution time
Points of attention

Read the whole file in 2 minutes: documents, criteria, pitfalls, summed up by the AI reading.

Book a demo

Similar open tenders

See all →

Your next tender may be published this morning.

Choose an advisor and a time. 30 minutes at most, by video or WhatsApp, in French, Arabic or English.

Loading the calendar…