Closed

la réalisation des travaux de la signalisation horizontale et verticale de la section 3 (DRIOUCH – PORT NADOR WEST MED) de l'autoroute Guercif – Nador, provinces de Driouch et Nador.

Reference06/2025/DRETLO
CategoryWorks
Place of workNador
Estimate10,626,300 MAD
Provisional guarantee160,000 MAD
Deadline16 Oct 2025, 10:00
Required qualifications

Equipement / X- Signalisation et equipements de securite / X.1- Travaux de signalisation horizontale / Classe 1 • Equipement / X- Signalisation et equipements de securite / X.2- Travaux de signalisation verticale et équipements de sécurité / Classe 1

AI summary of the file

Members only
Documents required
Award criterion
Execution time
Points of attention

Read the whole file in 2 minutes: documents, criteria, pitfalls, summed up by the AI reading.

Book a demo

Similar open tenders

See all →

Your next tender may be published this morning.

Choose an advisor and a time. 30 minutes at most, by video or WhatsApp, in French, Arabic or English.

Loading the calendar…