Closed

CONTRÔLE ET SUIVI DE LA QUALITE DES TRAVAUX D’ELARGISSEMENT ET MISE A NIVEAU DE LA VOIE EXPRESS URBAINE ENTRE TREMIE BARREAU EST - OUEST ET LA RN11

Reference36/2025/S2A
CategoryServices
Estimate489,072 MAD
Provisional guarantee7,300 MAD
Deadline12 Mar 2025, 10:00
Required qualifications

Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DE TERRASSEMENT ET CHAUSSEES AVEC COUCHE DE ROULEMENT EN REVETEMENT SUPERFICIEL / Classe 1 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DES CHAUSSEES BITUMINEUSES TYPE-1 A BASE DE MELANGE HYDROCARBONE COURANT / Classe 1 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DES CHAUSSEES BITUMINEUSES TYPE-2 A BASE DE MELANGE HYDROCARBONE NON COURANT Y COMPRIS LE CONTROLE DES ETUDES DE FORMULATIONS DE BITUME / Classe 1 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DES OUVRAGES D'ART COURANTS / Classe 1 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DES TRAVAUX DES LOTS SECONDAIRES DES BATIMENTS / Classe 1 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DE LA QUALITE DE SIGNALISATION HORIZONTALE ROUTIERE / Classe 1 • Laboratoires / CONTROLE DE QUALITE / CONTROLE DE LA QUALITE DE SIGNALISATION VERTICALE ROUTIERE / Classe 1

AI summary of the file

Members only
Documents required
Award criterion
Execution time
Points of attention

Read the whole file in 2 minutes: documents, criteria, pitfalls, summed up by the AI reading.

Book a demo

Your next tender may be published this morning.

Choose an advisor and a time. 30 minutes at most, by video or WhatsApp, in French, Arabic or English.

Loading the calendar…